About Concrete Estimation

This calculator estimates the volume of concrete required for common forms. Always add 5-10% extra for waste, spillage, and uneven subgrade. One 50kg bag of cement yields roughly 0.035 m³ of concrete; one 80lb bag of ready-mix yields 0.6 ft³ (~0.017 m³).

Pour Dimensions

Shape
Units
Waste Allowance (%)

Result

Volume (m³)
3.05
Volume (ft³)
107.7
Volume (yd³)
3.99
50kg Cement Bags (~)
87

With 10% waste: 3.05 m³ of concrete needed.